Research on cooperative scheduling and power restoration strategy of intelligent operation and maintenance equipment under flood disaster based on dynamic planning

Hao Dai1, Guowei Liu1, Lisheng Xin1, Longlong Shang1, Qingmiao Guo1, Hao Deng1
1Shenzhen Power Supply Co., Ltd., Shenzhen, Guangdong, 518000, China

Abstract

In order to cope with the damage of urban electricity and the dilemma of residents’ electricity consumption caused by flooding disaster, we study the dynamic planning of intelligent operation and maintenance equipment scheduling and distribution network restoration under flooding disaster. Consideration is given to both pre-disaster deployment and post-disaster scheduling levels, while dynamic planning is carried out for collaborative repair and energy storage scheduling to construct a scheduling model with multi-source collaboration. Based on this, a multi-resource cooperative post-disaster recovery strategy for distribution networks is further proposed. The usability of this paper’s multi-source cooperative strategy is studied in depth through case analysis. Among the six Cases of the simulation experiment, the total cost in Case 1, which is operated and restored according to the strategy proposed in this paper, is the lowest, which is only 257080.2 RMB. The maximum, minimum, and average values of the solution time of the multi-source cooperative strategy are much faster than those of the comparison methods, and it has obvious advantages in fast decision making. The multi-source synergy model in this paper is able to recover all the loads within 285 min, while the finite synergy model takes 330 min. The multi-source synergy model was able to recover 7,500 kW of load, while the limited synergy model was only able to recover 6,850 kW. The multi-source cooperative model has strong applicability.

Keywords: dynamic planning, cooperative scheduling, multi-source collaboration, intelligent operation and maintenance equipment, power restoration