For building construction enterprises, civil engineering project schedule assurance is the embodiment of project performance ability, and project cost control is the root of project profitability. This paper researches the cost-schedule control method based on BIM and critical path earned value method, and establishes a complete set of dynamic cost-schedule analysis and control method including plan preparation, process evaluation and result correction. This paper takes Project F as an example, integrates project management in the BIM platform and optimizes the plan through construction simulation, so that the construction plan is closer to the actual demand, establishes the Earned Value Method for distinguishing the critical path and embeds it into the BIM platform, reflects the progress with the Earned Value parameters of the critical path, reflects the cost with the Earned Value parameters of the whole project, analyzes the problems of the critical path and the project and proposes cost-schedule corrective measures in a targeted way. The critical path and project problems are analyzed, and cost-schedule corrective measures are proposed, so as to realize the fine management of project cost-schedule. Through the case study, it is proved that based on BIM critical path earned value method can achieve schedule and cost coordination and dynamic control and realize 91.8% cost reduction, good civil engineering project management efficiency and change the status quo of civil engineering project cost management.
1970-2025 CP (Manitoba, Canada) unless otherwise stated.