In today’s increasingly stringent sewage discharge standards, the construction of a new generation of wastewater treatment plants more and more urgent. This paper adopts MBBR as the main process to treat wastewater, the pretreatment process of wastewater treatment plant adopts coarse and fine grating + cyclone sand sedimentation tank, and the secondary treatment process selects AAO process. Through the reasonable calculation of water volume and hydraulics, and then calculate the size of each structure. Based on the ASM2 model, combined with the conversion rate equation of the AOO reaction tank, the kinetic model of the wastewater treatment system was constructed. Analyzing the inlet and outlet water quality monitoring data of the high-efficiency wastewater treatment plant for one year of operation, it was found that the average values of inlet and outlet water COD concentration in one year of operation were 255.437 and 10.556 mg/L, respectively, and the annual average removal rate was 94.37%. The average values of ammonia nitrogen in and out of the water for the whole year were 32.085 and 1.107mg/L, and the average ammonia nitrogen removal rate was 96.98%. All the effluent indicators have reached the “urban sewage treatment plant pollutant discharge standards” level A discharge standards and environmental protection departments on the effluent indicators, indicating that the overall operational efficiency of the research-designed high-efficiency wastewater treatment plant is good, and has reached the expected goals, with significant environmental and social benefits.
1970-2025 CP (Manitoba, Canada) unless otherwise stated.